finished

open fun finished(@Nonnull environment: Environment<T, GeoPosition>, @Nonnull time: Time, step: Long)(source)

Override to change or add operations to be done after a simulation is concluded.

Parameters

environment
time

The time at which the simulation ended

step

the step at which the simulation ended